Environmental services
WATER, VEGETATION, MIGRATION, WASTE, NOISE
Planned investment projects – constructions, facilities or other activities with direct and indirect impacts on the environment must pass the Environmental Impact Assessment (EIA) process according to the applicable legislation.

Our employees have many years of experience with the EIA process for investment projects. We provide a full range of services, including advisory and consultancy services.

We prepare dispersion studies and noise studies that are required during the EIA process – these are one of the documents used to evaluate the impact of the project on air quality and public health.

The dispersion studies are also used as a basis for issuing a binding statement and a permit to operate the source according to the Air Protection Act. In this case, the dispersion study is prepared for the specifically listed stationary sources of air pollution and also for the construction of selected roads and parking lots.

We provide modelling and visualisation of noise propagation – acoustic studies – including designs of noise protection solutions.

We draw up expert opinions for the specifically listed sources listed in the Annex to the Air Protection Act as a basis for issuing a binding statement and a permit to operate the source.

To evaluate the project’s environmental impact, we provide biodiversity surveys focused on various groups of plants and animals, including proposals for conservation actions and discussions with nature protection authorities. In addition, in the case of the need for felling in the preparation of individual projects, we provide a dendrological survey, which assesses the health status, parameters and other characteristics of the felled trees, including the calculation of ecological damage.

We offer a full range of services in corporate ecology, primarily in providing services of an external corporate ecologist, as well as advisory and consultancy services in this area or the preparation of partial documentation and its negotiation with the relevant state administration.

On your behalf, we will process the reporting obligations in waste management, operation of air pollution sources and water management (ISPOP reporting). We will also handle related documentation such as operating rules, emergency plans, risk assessment of ecological damage, rules for handling hazardous chemicals, ADR, records of continuous waste management, hazardous waste identification sheets…

We will also prepare an application for an integrated permit required for facilities specified in the Annex to the Integrated Prevention Act (e.g. large chemical, agricultural, metallurgical and food processing plants).
#valbek #ecofriendly

Environmental services
Ing. Lukáš
Hruboň, MBA
CEO
& Chairman of the Board of Directors
Valbek group
+420 487 070 435
lukas.hrubon@valbek.eu
Ing. Luboš
Štancl
AZ GEO, s.r.o.
Ostrava
+420 553 038 842
lubos.stancl@azgeo.cz
Realizace
Navazující
Obory
JOIN US
More info
VISIT OUT
OUR COMPANY BLOG
More info
ZAJÍMAJÍ VÁS PŘÍBĚHY Z NAŠEHO OBORU?
Along the bustling streets of Malmö and in the heart of Gothenburg, Valbek Sweden has opened its doors to two new insp...
K. Jiroušová
08/05/2024
Bridges and tunnels play a key role in construction and infrastructure development. Behind every one of these small, l...
B. Klímova
27/02/2024
This time we talked to Magdalena Kopecka, a planner who is responsible for assessing the impact of planned buildings o...
N. Kozohorská
24/01/2024

Valbek, spol. s r.o.

IČ: 48266230
DIČ: CZ48266230
ID: bebs53h

Valbek, spol. s r.o., registered at the Regional Court in Ústí nad Labem under file number C 4478.


VALBEK-EU, a.s.

IČ: 00671347
DIČ: CZ00671347
ID: gku9nkx

VALBEK-EU, a.s., registered at the Regional Court in Ústí nad Labem under file number B 2392

Sectors

 

Design services

Surveys and testing

Consultations

Construction

Research & Development

Sustainability

All activites


Documents

ČSN EN ISO 9001 CZ
ČSN EN ISO 14001
ČSN ISO 45001
ČSN EN ISO/IEC 27001:2014
IMS Politics


Ochrana dat

GDPR
Cookies

 

Billing e-mail

Please send invoices to: recepce@valbek.cz


EU Operational Program

Research and development of the use of UHPC for the main structural elements of civil engineering transport buildings.

 

 

 

 

© 2024 Valbek.CZ.

All Rights Reserved.

Cookies
Webové stránky používají cookies, díky kterým je prohlížení stránek příjemnější a snazší. Ke zpracování některých cookies potřebujeme od vás souhlas, který dáte kliknutím na "Přijmout vše", nebo nastavte jednotlivě v "Nastavení souborů cookie“. Více informací najdete zde.

Odmítnout vše     Nastavení cookie     Přijmout vše